Corcoran Yard

Two five-story buildings and a mid-block lane on a former car lot, a short walk from the farmers' market.

Status
Under construction
Timing
First homes late 2027
Where
Central Park, Durham
Type
Mixed-use
Size
210 apartments, 18,500 sq ft of shops
Address
620 Foster Street
Five-story brick apartment building with shops at street level

At a glance

  • A new public lane connects Foster Street to the greenway
  • Mass-timber floors above a concrete podium
  • 32 apartments at below-market rents for thirty years
  • All-electric building with rooftop solar
Architect
Okafor Lindqvist Studio
General contractor
Tarwick Builders

Join the interest list

Corcoran Yard replaces two acres of asphalt with homes, shops and a lane wide enough for a market stall and a fire truck.

The site sits between Durham’s Central Park and the Ellerbe Creek greenway. Rather than one long building, the plan splits into two with a lane between, so the walk from the park to the trail runs through the block and past the shopfronts.

Progress

Foundations were completed in March 2026. The podium is poured and timber framing reaches the third floor on the north building. We post a photo and a schedule note on the site fence every Friday.